Personnel Space

SEARCH

tarif

Expected investments in 2010

 Transportation equipments

The fleet of society will be strengthened during 2010 by acquiring 36 new buses (18 standard buses, 6 articulated buses, 6 standard buses, 3 comfort buses and 3  minibuses)
 
 Renew the structures of 10 vehicles


 
Improving infrastructure

 Implementation of new bus shelters
 
Installation of a second gantry vehicle washing Zarzouna the repository
 
Work of separation workshops agency Mateur Bus Station Traveler (continuation project 2009-2010).
 
Development of the bus station urban and suburban lines located at Quai Tarak Ibn Zied, Bizerte (continuation project 2009-2010).
 
Rocky Point desk in accordance with the label "Marhaba" to headquarters.


 Improving the safety

Installation of a technical inspection of vehicles to the filing of Ras Jebel (continuation project 2009-2010).
 
Installing a good test of the brake shop Mateur (continuation project 2009-2010).
 
Establishment of a support system operations and traveler information (SAEIV) on all vehicles of the company and its entire network (project continuation 2009-2010).


 
Management methods improvement

 Establishment of an integrated management information system (project continuation 2009_2010).
 
 Website hosting company: www.srtbizerte.com.tn in Arabic and English
 
 Adequacy of quality management in the 2008 version
 
Establishing a system of environmental management ISO 14001
 
Certification Project to the label "Marhaba" to host the headquarters and operating agencies.

 

Home | Overview | Services | Quality/Safety | Discover Bizerte | Notices | Sale online | contact
Société Régionale de Transport de Bizerte (c) 2011 - Email : boc@srtbizerte.com.tn / Tel : 72 443 026 / Fax : 72 430 180